
Our maintenance team monitors monthly water consumption, and sensor-controlled urinals and sensor taps in public toilets reduce usage. Slimline cisterns and double flush systems are installed in all toilets, with regular spot checks conducted. A rainwater harvester is installed onsite to water the window boxes.
The Shelbourne is undergoing room renovations to May 2027 – some noise may occur. The Spa, including the swimming pool, is now closed.